News
Public · Published
Lunnon Metals Records Strong Gold Recoveries at Hustler Deposit
Lunnon Metals reported gold recovery above 95% from all three Hustler deposit test samples after 24 hours of processing. Average recovery was 96.4% at a 150-micrometre grind and 97.3% at a finer grind; testing was designed to replicate the nearby Lefroy gold plant.
Published:
Updated:
What happened
Lunnon Metals reported gold recovery above 95% from all three Hustler deposit test samples after 24 hours of processing. Average recovery was 96.4% at a 150-micrometre grind and 97.3% at a finer grind; testing was designed to replicate the nearby Lefroy gold plant.
Confirmed
Global impact / market context
High recovery means a large share of gold in the tested material was extracted, an encouraging technical input for Hustler development studies. If later work supports these results, the project could require less gold-bearing material to produce a given amount of gold, affecting expected processing needs and costs.
Analyst inference
The tests covered three samples representing different grades and material types in Hustler’s mineral resource estimate, but they are not a production result. The article says the findings add technical input to development studies; it provides no project economics, mine plan, or investment decision.
Confirmed
What to watch
- Further development studies may show whether these sample recoveries hold across a broader range of Hustler material and how processing choices affect expected gold output. Analyst inference
- Watch for details on the proposed processing approach, including grind size and the role of gravity recovery, which separates gold using differences in weight. Analyst inference
- The supplied article reports test results and their role in development studies, but gives no economic estimates, mine schedule, or decision to develop Hustler. Confirmed